Piedra Larga Wind Project

Client

Piedra Larga Wind Farm (Phase 1)

Location

en Unión Hidalgo, Oaxaca, México.

Start Date

2014

Completion Date

2016

BEP Advisors led and implemented an Environmental Due Diligence project for the Piedra Larga Wind Farm (Phase 1) in Unión Hidalgo, Oaxaca, Mexico. Phase 1 (90 MW) involves the installation and operation of 45 horizontal wind turbines, each with a capacity of 2 MW; a substation and operations center, two wind direction towers, the respective access roads, and 30 km of transmission lines connecting the main Ixtepec substation (2,500 MW) to the CFE (Federal Electricity Commission) from the Piedra Larga substation. Special attention was given to potential collisions involving migratory birds and bats, along with corresponding mitigation measures. The assignment was completed in compliance with the IDB-MIGA Environmental Safeguards, with the support of Mexico’s Nacional Financiera (NAFIN).

Ready to drive sustainability in your company? Fill out our form and get a quote for your project.

Fill out the form and get a quote for your project.

Our Clients

At BEP Advisors, we are accustomed to working with high standards and collaborating with some of the most prominent managers in the industry. Our approach is centered on the philosophy of trust and respect for our clients’ requirements and expertise. We take pride in having a team of certified consultants with extensive experience, known for their practical approach, quick adaptation, and delivering excellent results.